Epiroc / Atlas machine guidance
- Rick Perissinotto
- Topic Author
- Offline
- New Member
Less
More
2 years 11 months ago #210
by Rick Perissinotto
Replied by Rick Perissinotto on topic Epiroc / Atlas machine guidance
Thanks Noel,
They have moved on from tl8 and now all in .xml which works in well with Trimble BC.
Cheers
Rick
They have moved on from tl8 and now all in .xml which works in well with Trimble BC.
Cheers
Rick
Please Log in to join the conversation.
- Noel Causerano
- Offline
- New Member
Less
More
- Posts: 8
- Thank you received: 0
3 years 3 weeks ago #207
by Noel Causerano
Regards
Noel Causerano
Senior Mine Surveyor – Mount Isa Mines
Replied by Noel Causerano on topic Epiroc / Atlas machine guidance
Rick,
We use E2C here are Northparkes.
Design Centreline in TL8 format. Note X and Y coordinates need to be swapped around. Laser lines in LAS format.
Give me a call if you need any assistance.
We use E2C here are Northparkes.
Design Centreline in TL8 format. Note X and Y coordinates need to be swapped around. Laser lines in LAS format.
Give me a call if you need any assistance.
Regards
Noel Causerano
Senior Mine Surveyor – Mount Isa Mines
Please Log in to join the conversation.
- Rick Perissinotto
- Topic Author
- Offline
- New Member
Less
More
- Posts: 5
- Thank you received: 0
3 years 1 month ago #205
by Rick Perissinotto
Epiroc / Atlas machine guidance was created by Rick Perissinotto
Is anyone out there using Advanced Boom Control / Rig Control System 5 for machine guidance on their Epiroc/Atlas development jumbos?
Our new jumbo hasn't arrived yet and I'm wondering what file format I'll need to get designs and profiles into Underground Manager 2.0.
Cheers
Rick
Our new jumbo hasn't arrived yet and I'm wondering what file format I'll need to get designs and profiles into Underground Manager 2.0.
Cheers
Rick
Please Log in to join the conversation.